News

  • Beer Botttles
    30.10.2018
    In 2014 EME built a batch plant that has reliably supplied Furnace 1 and Furnace 2 at the Piedras Negras site of our customer IVC in Mexico with high-quality batch for the production of beer bottles. The plant was designed with a capacity of 870 tonnes per day. In addition to the batch plant, EME also supplied the cullet recycling systems for both of these furnaces. All of these systems are running to the full satisfaction of our customer. As a result, we are particularly pleased to announce that INDUSTRIA VIDRIERA DE COAHUILA has awarded EME the contract for their latest batch plant and the cullet return system, feeding their new furnaces, Furnace 5 and Furnace 6. The new batch plant will produce up to 1050t of batch in 16 hours after commissioning of Furnace 6.
  


EME-INFO-SERVICE

ยป To Downloads &
   Press/News archive
  

»  GETTING VIDRIO FORMAS ALL FIRED UP FOR THE FUTURE [more...]
»  EME technology for Indian solar glass producer Borosil [more...]
»  EME starts turn-key job at HEINZ-GLAS Dzialdowo in Poland [more...]
»  Meeting 9.5 million new daily demands [more...]
»  EME completes advanced Batch Plant Upgrade at Techpack Solutions in South Korea [more...]




powered by webEdition CMS